Loading...
Machias Valley News Observer
Machias Valley News Observer
Subscribe or Sign in
Machias Valley News Observer
Machias Valley News Observer
|
Subscribe or Sign in
  • Home
  • Latest News
  • Contact Us
  • About
  • Advertising
  • Digital Version
  • Sign In
Read more
Retired Machiasport Fire Chief Receives Spirit of America Award

Retired Machiasport Fire Chief Receives Spirit of America Award

Senate Candidate Graham Platner Stumps in Machias

Senate Candidate Graham Platner Stumps in Machias

Jonesporters Borrow $200K for Marina, Return $15K Donations for Old Building

Jonesporters Borrow $200K for Marina, Return $15K Donations for Old Building

Monthlong Machias Bridge/Route 1 Dike Closure Begins April 1

Mar 19, 2026, 09:43 — 1 min read
Share on Facebook Share on Twitter Share via Email Copy link Featured post paid
Monthlong Machias Bridge/Route 1 Dike Closure Begins April 1
Deja Vu all over again? These flashback photos show the temporary Machias dike bridge replacement project in December 2023 Machias dike, beginning from top left with the bridge’s closure on Day One (Dec. 4), and the placement of the temporary bridge (Dec. 6). Dirt ramps leading onto the bridge are seen being prepped for paving in the Dec. 9 photo. Bottom left photo shows guardrails being installed on Dec. 14, with the bridge reopened in the bottom right photo on Dec. 15. A new improved, but still “temporary,” bridge will be replacing it in a project beginning April 1. (Paul Sylvain photos)

This post is for paying subscribers only

Subscribe now

Already have an account? Sign in

Machias Valley News Observer
Machias Valley News Observer
(207) 255-6561, 41 Broadway Machias, ME, USA 04654 Serving Machias and Washington County for over 170 years.
  • Sign up
© 2026 Machias Valley News Observer.