Maine DOT Acts to Avert Catastrophic Failure of Route 1 Dike

Town Manager Predicts Project Could Take ‘Years’

By Paul Sylvain

A years-long debate over whether to simply rebuild Machias’s crumbling Civil War-era dike and Route 1 causeway with a new, improved version or remove and replace the dike with a bridge was decided last week by Maine Department of Transportation with news that sections of the existing structure are teetering on the edge of catastrophic failure.

Related Posts
No image
Mini UCONN In Lubec
Maine DOT Acts to Avert Catastrophic Failure of Route 1 Dike
First town playground opens at Machias rec area
No image
Participate in the true meaning of Christmas